What needs to follow a “pass” result?

An inspection report can support a purchasing decision when the inspected material, methods, and acceptance conditions are clear. Establish whether it covers the lot being offered or delivered, then examine the work performed. A pass label, equipment photograph, or laboratory logo is insufficient to establish that every device meets every specification throughout its service life.

Connect samples to the delivery

Check the complete ordering code, package, lot, date code, submission date, and sample quantity. Sample identifiers should connect to submission or packing records. A report on samples from a different lot is not a direct inspection result for the delivered lot. If proposed as reference information, disclose the difference and let the buyer’s quality reviewer determine whether sampling or further testing of the delivered lot is needed. Treat missing lot fields as a limitation rather than filling them from the quotation.

For an illustrative offer of one thousand devices with a report covering five samples, ask who selected the samples, which packages they came from, and what sampling plan was agreed. This example does not prescribe a universal sampling ratio. Sample size and selection should follow the buyer’s quality requirements, risk assessment, and applicable method.

Distinguish observations from conclusions

  • Visual and marking inspection: identify the appearance, dimensional, or marking checks actually recorded. Visual consistency does not establish compliance with every electrical requirement.
  • Electrical or functional testing: review measured parameters, conditions, limits, and the referenced datasheet revision. Testing selected functions should not be rewritten as full specification verification.
  • Other analysis: interpret X-ray, decapsulation, or other work through the stated method, observations, and conclusions. A method name alone is not an authenticity conclusion.

Select inspection work according to the intended use and buyer requirements. Where an order requires inspection, document the agreed scope, executing organization, cost, and timing. The methods above should not be assumed to be included in every order.

Verify the laboratory and its accredited scope

ILAC explains that accreditation certificates identify the accredited scope, while reports include results and the standards or methods used. Check accreditation status and scope through the relevant accreditation body. Match the laboratory name and address to the report. Accreditation for a particular scope does not cover all work performed by that laboratory and does not confer accreditation on a customer or distributor. Verify the particular report separately: use independently obtained official laboratory contact details to check the report number, revision, and sample information. Refer questions about accreditation status or scope to the relevant accreditation body.

Turn the review into an actionable record

Record the report identifier and revision, covered lot, completed checks, exclusions, and unresolved deviations. Preserve the relationship between an original report and a corrected version. Acceptance, further testing, or a hold decision should be made by the buyer’s designated reviewer with the reasons retained.

An RFQ to KETAIC can include the required inspection scope and report requirements, with a request to confirm whether that offer can meet them. Mark reports not yet obtained as pending. Mark omitted tests as not stated, pending clarification; use not performed only when non-performance has been confirmed. This makes subsequent acceptance easier to evaluate than a pass statement without a defined scope.

Reference

ILAC: Accredited Conformity Assessment Bodies. Accreditation statements follow this source; sample-review steps are original purchasing recommendations.